1. Home
  2. Digitalization
  3. QualiNex APQP & PFMEA
QualiNex Manufacturing quality intelligence

APQP & PFMEA software - every core tool linked, every audit ready

QualiNex links your Process Flow, PFMEA, Control Plan, MSA, SPC, DVP&R and PPAP through one characteristic master. Change a spec once and every document that depends on it is flagged, updated and revision-controlled - with AIAG formats, controlled-copy PDFs and a signed audit trail ready for IATF 16949.

  • AIAG-VDA PFMEA with Action Priority
  • Audit-ready for IATF 16949
  • 100% customizable · cloud or on-premise
7Core tools linked: PF, PFMEA, CP, MSA, SPC, DVP&R, PPAP
1Characteristic master - change it once
18PPAP elements, levels 1 to 5
100%Customizable to your formats

What is QualiNex?

QualiNex is APQP and core-tools quality software built by Qubha Infotech, Chennai, for manufacturing plants. It keeps the Process Flow, PFMEA, Control Plan, child-part control plans, MSA, SPC, DVP&R and PPAP of every part in one system, linked through a single characteristic master, so the documents can never drift apart.

PFMEA follows the AIAG-VDA FMEA Handbook with Action Priority; MSA, SPC, Control Plan and PPAP follow the AIAG manuals. Every document is approved and revision-controlled, exports to controlled-copy PDF and Excel in AIAG layouts, and every change is kept in a digitally signed audit trail. Built for automotive and IATF 16949 suppliers - and used the same way by any manufacturer that runs PFMEAs and control plans.

The linked APQP chain

In most plants these are separate Excel files that stop matching the day after the audit. In QualiNex they share one characteristic master - and rules keep them in step.

  1. PF

    Process Flow

    Steps with ASME symbols, machines, product and process characteristics, spec and class.

  2. PFMEA

    Risk analysis

    Pulled from the flow: one line per step × characteristic; S, O, D and Action Priority.

  3. CP

    Control Plan

    Pulled from the PFMEA: evaluation, sampling, control method and reaction plan.

  4. MSA

    Measurement

    Gauge R&R, bias, linearity and attribute studies for every CC and SC gauge.

  5. SPC

    Capability

    Control charts, run rules, Cp, Cpk, Pp and Ppk on every special characteristic.

  6. PPAP

    Approval

    18 elements and the PSW assembled from the approved, linked documents.

When this happensQualiNex does this automatically
A spec, class, gauge or measurement method changesEvery Control Plan line using that characteristic is flagged Needs review; owners of approved PFMEAs and control plans are told to open a revision.
A PFMEA line is saved with severity 9 or 10The characteristic becomes CC and MSA and SPC become required. S 5-8 with O ≥ 4 gives SC.
PFMEA prevention or detection controls changeThe control method updates in draft control plans; in approved plans the line is flagged instead.
A PFMEA line is deletedIts Control Plan lines are unlinked and flagged - nothing silently disappears.
An SPC subgroup is enteredRun rules and spec limits are checked; SPC owners are alerted on a violation or when Cpk drops below 1.33.
An MSA study is saved%GRR, ndc and bias are calculated per AIAG MSA 4th edition; conditional or unacceptable results raise an alert.
A change request is implementedNew draft revisions open for every affected approved document.
Every hourAlerts for overdue PFMEA actions, MSA re-studies due and gauges due for calibration.
Why plants switch

From disconnected Excel files to one living APQP file

Spreadsheets work for the first PPAP. Then a drawing changes, a gauge is replaced, a customer audit is announced - and nobody is sure which version is right.

PFMEA and control plan in Excel

  • The control plan no longer matches the PFMEA after the last change.
  • Special characteristics marked in one file, missing in another.
  • High-risk lines with no action - found by the auditor, not by you.
  • MSA and Cpk evidence in separate folders, some of it overdue.
  • Days of clean-up before every IATF or customer audit.

With QualiNex

  • Linked by design - PF, PFMEA and Control Plan pull from each other.
  • CC / SC auto-classified from severity and occurrence.
  • High AP blocked from approval without action or justification.
  • Linkage compliance shows every CC/SC with PFMEA, CP, MSA and Cpk.
  • Audit-ready every day - approved revisions, PDFs and signed history.
Features

Every APQP core tool, in one quality system

Not a PFMEA template or an SPC add-on - the complete set of documents a supplier needs from launch to PPAP and through every change after.

Process Flow

The start of the chain.

  • Steps & symbolsASME operation, inspection, transport, storage, delay, rework
  • CharacteristicsProduct and process side by side, with spec and class symbol
  • MachinesMachine and equipment per step
  • AIAG headerCover block edited in place while in draft

PFMEA (AIAG-VDA)

Risk you can act on.

  • Spreadsheet gridEdit in place; failure modes grouped by step, gaps shown
  • S, O, D & APAction Priority from the AIAG-VDA table, plus RPN
  • Action trackerPrevention and detection actions with owner and due date
  • Approval gateNo High AP line without action or justification

Control Plan

Pulled from the PFMEA.

  • AIAG phasesPrototype, pre-launch, safe launch, production
  • Sampling by classDefaults for CC, SC and standard characteristics
  • Review flagsLines flagged when the source changes
  • Child-part plansSupplier and receiving-inspection controls

MSA & gauges

AIAG MSA 4th edition.

  • Gauge R&RAverage and range method; %GRR and ndc
  • Bias, linearity, stabilityWith acceptance verdicts
  • Attribute agreementEffectiveness against reference
  • Gauge registerCalibration due and re-study alerts

SPC & capability

Stable and capable, proven.

  • Control chartsX̄-R, and I-MR for single readings
  • CapabilityCp, Cpk, Pp and Ppk
  • Run rulesWestern Electric rules on every subgroup
  • AlertsRule violations and Cpk below 1.33

PPAP & DVP&R

Approval, with evidence.

  • Levels 1-518 elements with submit / retain matrix
  • PSWPart Submission Warrant with reasons for submission
  • Initial process studyPpk, subgroup and reading checks
  • DVP&RDV and PV tests with results

Change & revisions

Controlled, every time.

  • Change requestsImpact analysis and automatic risk level
  • LifecycleDraft, in review, approved, revise, obsolete
  • SnapshotsFrozen at each approval, with revision history
  • NotificationsOwners told when their document is affected

PDF & Excel in AIAG layouts

Print-ready controlled copies.

  • Controlled-copy PDFISO 9001 §7.5: number, revision, status, page x of y
  • Excel workbooksAIAG cover block, colour sections, signature block
  • Print setupA3 / A4 landscape, headers repeated on each page
  • DRAFT watermarkOn anything not yet approved

Audit trail & security

Every change, provable.

  • Field-level auditWho, when, IP, old and new value
  • Signed rowsHMAC-SHA256 with one-click integrity check
  • Roles & permissionsView, manage, approve, export per module
  • Sign-in logLockout, forced password change, token rotation
Inside QualiNex

How it works, screen by screen

Sample data from a brake caliper part. Your parts, your characteristics, your customer formats.

Process Analysis workspace

Process Flow, PFMEA and Control Plan as linked tabs

Open a part and its three main-line documents appear side by side as spreadsheet tabs - edited in place, like Excel, but linked. The connector between tabs shows whether they are in sync, how many lines are waiting to be pulled, or whether they are not linked yet.

  • Pull from Process Flow - one PFMEA line per operational step × characteristic; safe to repeat.
  • Pull from PFMEA - Control Plan lines grouped by step with machine, spec, evaluation, sampling and reaction plan.
  • Generate in one click - when the next document does not exist yet.
  • Manual stays manual - type a control method by hand and the next pull will not overwrite it.
PFMEA software

AIAG-VDA PFMEA with Action Priority - and a gate on high risk

Severity, occurrence and detection are dropdowns; Action Priority and RPN are calculated on the server from the AIAG-VDA table, so every engineer rates risk the same way. The standard AIAG-VDA header - company, location, customer, model year, PFMEA ID, team - sits on top of the form.

  • Structure, function, failure, risk, optimization - the AIAG-VDA seven-step layout, colour-coded.
  • CC and SC from risk - S ≥ 9 makes the characteristic critical; S 5-8 with O ≥ 4 significant.
  • No silent high risk - submit is blocked while a High-AP line has no action or justification.
  • Action tracker - every prevention and detection action with owner, due date and status.
MSA & SPC software

Measurement you can trust, capability you can prove

Every special characteristic needs a capable gauge and a capable process. QualiNex calculates gauge R&R, bias and attribute agreement to AIAG MSA 4th edition, and draws control charts with Cp, Cpk, Pp and Ppk from the subgroups your inspectors enter.

  • %GRR and ndc - graded acceptable, conditional or unacceptable, with alerts.
  • Run rules on every entry - beyond 3σ, 2 of 3, 4 of 5 and 8 in a row.
  • Cpk watch - SPC owners alerted the moment Cpk drops below 1.33.
  • Gauges and calibration - register, due dates and re-study reminders.
PPAP software

A PPAP package built from documents that are already approved

Choose the submission level and QualiNex lists the 18 PPAP elements with what must be submitted and what retained. Process flow, PFMEA, control plan, MSA and process studies come straight from the linked, approved documents - not from copies in a folder.

  • Part Submission Warrant - reasons for submission, declaration and customer disposition.
  • Initial process study check - Ppk ≥ 1.67, 25 subgroups and 100 readings, or customer agreement.
  • Dimensional results - measurements checked against the specification limits.
  • Interim or full approval - the customer decision and history kept with the part.
Dashboard

Know your audit readiness before the auditor does

The dashboard shows APQP health at a glance: open high-risk lines, control plan lines waiting for review, MSA and Cpk results - and linkage compliance, the share of special characteristics that are fully covered.

  • Fully covered means in a PFMEA, in a Control Plan, with an acceptable MSA that is not overdue and Cpk ≥ 1.33.
  • Linkage matrix and traceability - follow any characteristic through every document.
  • Notifications - overdue actions, MSA re-studies and calibration due, every hour.
Audit trail

Every change recorded, signed and verifiable

Each create, edit, approval, export and denied request is recorded with the user, time, IP, record and field-level old and new values. Each row is signed with HMAC-SHA256, and Verify integrity proves nothing has been altered since.

  • Revision snapshots - the approved version of every document, frozen.
  • Export to Excel - hand the auditor the trail for any period.
  • Sign-in log - successful and failed sign-ins with reason and device.
Audit-ready documentation

What the IATF 16949 auditor asks - and where QualiNex answers it

Auditors pick a part and follow it from process flow to PPAP. With QualiNex, every answer is one click away.

The auditor asksWhere QualiNex answers it
"Show the PFMEA and control plan for this part - are they consistent?" (8.3.3.3, 8.5.1.1)Linked tabs in the Process Analysis workspace, with the in-sync status between them and the linkage matrix.
"How are special characteristics identified and controlled?" (8.3.3.3)CC/SC classification from PFMEA risk, customer symbols, and the linkage compliance figure for every special characteristic.
"What did you do about high-risk failure modes?"Action Priority on every line, the action tracker, and the approval gate on open High-AP lines.
"Show the MSA for this gauge." (7.1.5.1.1)Gauge R&R, bias, linearity or attribute study with %GRR, ndc and verdict, linked to the characteristic.
"Is the process capable?" (9.1.1.1)SPC charts with Cp, Cpk, Pp, Ppk and run-rule history for the characteristic.
"How do you control document revisions?" (ISO 9001 7.5)Draft → in review → approved → revise lifecycle, frozen snapshots, controlled-copy PDFs.
"How was this change reviewed and implemented?" (8.5.6)Change request with impact analysis and the new revisions it opened, plus 4M and ECN records.
"Who changed this value, and when?"Field-level, signed audit trail with old and new values.
Made forAutomotive & IATF 16949 suppliersForging & castingMachining & fabricationPlastics & rubberElectrical & electronicsAerospaceMedical devicesEngineering & process plants
Fully flexible

100% customizable - shaped around your plant, not the other way round

Qubha Infotech writes and supports QualiNex itself, so anything your customers or your process need can be built in.

Your formats

Form headers, columns and report layouts to match your customers' PFMEA and control plan formats.

Your symbols

Custom process-flow and customer-specific special characteristic symbols from the symbol library.

Your workflow

Roles, permissions, approval steps and numbering set to how your quality team works.

Your plants

One installation for several plants or companies, each with its own data and users.

Your server

Cloud, or your own Windows or Linux server - it even runs on plant networks without internet.

Your systems

Integration with SAP or your ERP, and with Qubha calibration, inspection, 4M and ECN software.

Buyer's guide

How to choose the best APQP and PFMEA software

What to check before you move your core-tools documents - and how QualiNex compares.

What to checkQualiNexStandalone FMEA toolExcel templates
PF, PFMEA and Control Plan linkedOne characteristic master, pull and syncFMEA only, export to CPCopy and paste
AIAG-VDA Action PriorityCalculated, with approval gateUsuallyManual lookup
Change cascadeDependent lines flagged, owners notifiedPartialNone
MSA, SPC and PPAPBuilt in and linkedSeparate productsSeparate files
Revision control & audit trailApproved snapshots, signed field-level trailVariesOverwritten
AIAG PDF and Excel outputControlled copy, A3/A4, signature blockFixed layoutsHand formatted
Customization100% - your formats, symbols, workflowConfiguration onlyAnything, but unlinked
Deployment & supportCloud or on-premise; the developers in ChennaiVendor cloud, ticket queue-
Getting started

Live in four steps - with your existing documents

We bring your current parts, PFMEAs and control plans across, so nobody starts from a blank sheet.

Set up

Plants, users, roles, numbering, form headers and your symbol library.

Migrate

Parts, characteristics, process flows, PFMEAs and control plans from Excel.

Customize

Customer formats, approval steps, reports and ERP integration.

Train & go live

Quality engineers and managers trained; support on phone and WhatsApp.

Glossary

APQP and core tools, explained

The terms you will meet in any APQP software - and where each lives in QualiNex.

APQP
Advanced Product Quality Planning - the AIAG framework for launching a product and process that meet customer requirements. In QualiNex: the linked document chain per part.
PFMEA
Process Failure Mode and Effects Analysis - how each step can fail, why, and how it is prevented and detected. In QualiNex: the PFMEA worksheet tab.
Action Priority (AP)
AIAG-VDA ranking of each PFMEA line as High, Medium or Low from S, O and D. In QualiNex: calculated on every line.
RPN
Risk Priority Number - severity × occurrence × detection, the classic FMEA ranking. In QualiNex: shown beside AP.
Control Plan
For each step and characteristic: spec, measurement, sample size and frequency, control method and reaction plan. In QualiNex: pulled from the PFMEA.
CC / SC
Critical and significant special characteristics - safety, regulation, fit or function. In QualiNex: classified from PFMEA risk.
MSA & gauge R&R
Measurement System Analysis; gauge R&R measures repeatability and reproducibility as %GRR and ndc. In QualiNex: MSA studies.
SPC, Cpk & Ppk
Statistical Process Control; Cpk and Ppk show how well a process fits within its tolerance. In QualiNex: SPC charts.
PPAP & PSW
Production Part Approval Process and its Part Submission Warrant, submitted at level 1 to 5. In QualiNex: PPAP packages.
FAQ

Questions people ask about QualiNex APQP & PFMEA software

What is QualiNex?

QualiNex is APQP and core-tools quality software built by Qubha Infotech in Chennai, India. It links Process Flow, PFMEA, Control Plan, child-part control plans, MSA, SPC, DVP&R and PPAP through one shared characteristic master, so a change made in one document reaches all the others, and every document is approved, revision-controlled and audit-ready.

What is APQP software?

APQP software manages the Advanced Product Quality Planning documents a manufacturer must create and keep current for each part: process flow diagram, PFMEA, control plan, MSA studies, SPC and capability, design verification and the PPAP package. Good APQP software links these documents so they cannot drift apart. QualiNex does this with one characteristic master and automatic change cascade.

What is PFMEA software?

PFMEA software is used to build and maintain Process Failure Mode and Effects Analyses: process steps, functions, failure modes, effects, causes, prevention and detection controls, severity, occurrence and detection ratings, priority and actions. QualiNex is PFMEA software that follows the AIAG-VDA FMEA Handbook, calculates Action Priority and RPN, and feeds its controls straight into the Control Plan.

How are the Process Flow, PFMEA and Control Plan linked in QualiNex?

All three use the same characteristic master. In the Process Analysis workspace the process flow, PFMEA and control plan of a part are chained tabs. PFMEA lines are pulled from the process flow, one per operational step and characteristic, and Control Plan lines are pulled from the PFMEA. The connector between tabs shows in sync, N to pull or not linked, and pulls are safe to repeat without losing your data.

Does QualiNex support the AIAG-VDA FMEA handbook and Action Priority?

Yes. PFMEA worksheets follow the AIAG-VDA FMEA Handbook layout with structure, function, failure, risk and optimization sections. Severity, occurrence and detection are chosen from dropdowns and the Action Priority (High, Medium, Low) is calculated on the server from the official AP table. The classic RPN is shown too, for customers that still ask for it.

What happens when a specification or characteristic changes?

When a characteristic's specification, class, gauge or measurement method changes, every Control Plan line that uses it is flagged Needs review, and the owners of affected approved PFMEAs and control plans are notified to open a revision. When PFMEA prevention or detection controls change, the control method is updated in draft control plans and flagged in approved ones.

How are special characteristics (CC and SC) identified?

QualiNex suggests the classification from risk: a PFMEA line with severity 9 or 10 makes the linked characteristic Critical (CC), and severity 5 to 8 with occurrence 4 or more makes it Significant (SC). CC and SC characteristics then require an MSA study and SPC. Customer-specific symbols such as a shield or a pentagon can be used for them.

Can QualiNex stop a PFMEA being approved with open high risks?

Yes. A PFMEA cannot be submitted for approval while any High Action Priority line has neither an action nor a written justification, and a control plan cannot be submitted while any of its lines is flagged for review. The PFMEA action tracker follows every prevention and detection action to closure.

Does QualiNex include MSA and gauge R&R?

Yes. MSA studies follow the AIAG MSA 4th edition: gauge R&R by the average and range method with %GRR and number of distinct categories (ndc), bias, linearity, stability and attribute agreement. Results are graded acceptable, conditional or unacceptable, alerts are raised for poor results and for re-studies that are due, and a gauge register tracks calibration due dates.

Does QualiNex include SPC and Cpk?

Yes. Subgroup data is entered against a characteristic and QualiNex draws X-bar and R charts (or individuals and moving range for single readings), calculates Cp, Cpk, Pp and Ppk, checks Western Electric run rules and specification limits on every entry, and alerts the SPC owners when a rule is broken or Cpk falls below 1.33.

Does QualiNex handle PPAP and the Part Submission Warrant?

Yes. A PPAP package follows the AIAG PPAP 4th edition: submission level 1 to 5, the 18 PPAP elements plus the bulk-material checklist with the submit or retain requirement for each level, the Part Submission Warrant with its reasons for submission, dimensional results, and an initial process study check (Ppk 1.67 or more acceptable, 1.33 to 1.67 needs customer agreement, at least 25 subgroups and 100 readings). Internal sign-off and the customer's disposition - approved, interim approved or rejected - are recorded.

Are the documents audit-ready for IATF 16949 and ISO 9001?

Yes. Every controlled document goes through Draft, In review, Approved and Revise with a frozen snapshot at each approval and a revision history. Controlled-copy PDFs carry document number, revision, status, page x of y, approval boxes and a DRAFT watermark when unapproved, following ISO 9001 clause 7.5. A field-level audit trail records who changed what, when and from which IP, and each row is digitally signed so tampering can be detected.

Can we export PFMEA and Control Plan in AIAG format to Excel and PDF?

Yes. Every PFMEA, Control Plan, Process Flow, DVP&R and the linkage matrix has a Download menu with a controlled-copy PDF and an Excel workbook built from the same form model: AIAG cover block, colour-coded sections, merged step cells, signature block, revision history sheet, and A3 or A4 landscape print setup with header rows repeated on every page.

Is QualiNex suitable for non-automotive manufacturers?

Yes. The AIAG formats come from automotive, but PFMEA, control plans, MSA and SPC are used the same way in forging, casting, machining, plastics and rubber moulding, sheet metal and fabrication, electrical and electronics, aerospace, medical devices, white goods, engineering and process plants. Field names, headers, symbols and report layouts can be adapted to your industry, customers or standard.

Can QualiNex be customized to our formats?

Yes, 100 percent. Qubha Infotech builds and supports QualiNex itself, so form headers, columns, customer-specific formats and symbols, approval workflows, numbering, roles, reports and integrations with ERP or SAP can all be changed to match how your plant and your customers work.

Can we use our customers' special characteristic symbols?

Yes. The symbol library lets you define custom process-flow symbols and customer-specific special characteristic symbols - for example a shield CC or a pentagon K - choosing shape, colours, inner text and customer. Each custom symbol maps to a standard meaning, so all the linkage rules keep working and the symbols print as vector graphics in PDFs.

Does it handle change requests and engineering changes?

Yes. A change request runs an impact analysis across linked documents and raises the risk level automatically. When the change is implemented, new draft revisions are opened for every affected approved document. QualiNex also works alongside Qubha's 4M Change Management and ECN Management software.

What is linkage compliance?

Linkage compliance is the dashboard figure showing the share of special characteristics (CC and SC) that are fully covered: in a PFMEA, in a Control Plan, with an acceptable MSA that is not overdue, and with SPC data showing Cpk of 1.33 or more. It tells a quality head at a glance how ready the plant is for a customer or certification audit.

Who can use QualiNex and how is access controlled?

Ready roles include administrator, quality manager, quality engineer and viewer, and you can create your own. Permissions are set per module as view, manage, approve and export, so for example engineers can author documents but only managers approve. Accounts lock after repeated failed sign-ins, the first sign-in forces a password change, and every sign-in is logged.

Can QualiNex run on our own server?

Yes. QualiNex runs in the cloud or on your own Windows or Linux server, with IIS or nginx. Fonts and libraries are self-hosted, so it works on plant networks without internet access. Several plants or companies can run in one installation, each with its own data.

Can we import our existing PFMEAs and control plans from Excel?

Yes. During setup Qubha Infotech migrates your existing parts, characteristics, process flows, PFMEAs and control plans from Excel or an older system, so you start with your current documents rather than retyping them.

How long does it take to go live?

A typical plant goes live in a few weeks: configure the company, users, roles and symbols, migrate parts and existing documents, adapt formats to your customers, and train quality engineers and managers. A pilot on one part family can start sooner.

How is QualiNex priced?

Pricing depends on whether you run it in the cloud or on your own server, the number of plants and users, and any customization. Setup, migration and training are included. Ask Qubha Infotech for a quote and a free demo.

What is the best APQP and PFMEA software for a manufacturing plant?

Choose software that links the process flow, PFMEA and control plan through common characteristics, follows the AIAG-VDA handbook and AIAG formats your customers expect, includes MSA, SPC and PPAP, keeps revision control and an audit trail for IATF 16949, can be customized to your formats, runs on your own server if needed and is supported by the people who wrote it. QualiNex by Qubha Infotech is built for exactly these needs.

Who makes QualiNex?

QualiNex is built and supported by Qubha Infotech Pvt Ltd, Chennai, Tamil Nadu, India, as part of its shop-floor digitalization platform. Setup, customization, training and support come from the same team that writes the software.

See QualiNex running one of your own parts

A 30-minute online demo. Send us a process flow or PFMEA - we will show it linked to its control plan, MSA, SPC and PPAP, in your format.